Δεν σας αρέσει; Δεν πειράζει! Μπορείτε να επιστρέψετε προϊόντα έως 30 ημέρες
Δεν θα κάνετε ποτέ λάθος με μια δωροεπιταγή. Χαρίστε στους αγαπημένους σας την επιλογή να διαλέξουν οι ίδιοι οτιδήποτε από τη συλλογή μας.
Έως 30 ημέρες για επιστροφή
Master Primavera P6 2026 with a practical, step-by-step approach designed to take you from the fundamentals of project scheduling to professional project controls.
Primavera P6 is widely used for planning, scheduling, monitoring, and controlling complex projects in construction, engineering, infrastructure, energy, oil and gas, telecommunications, and other project-based industries. This user guide focuses on helping beginners and developing professionals understand not only how to use the software, but also how the major scheduling concepts work together.
Inside this practical guide, you will learn how to:
• Navigate the Primavera P6 Professional interface and understand its essential tools and views
• Create and organize the Enterprise Project Structure (EPS), projects, Organizational Breakdown Structure (OBS), and Work Breakdown Structure (WBS)
• Create activities, milestones, activity IDs, durations, calendars, codes, and other essential project information
• Build logical activity networks using Finish-to-Start, Start-to-Start, Finish-to-Finish, and Start-to-Finish relationships
• Understand the Critical Path Method (CPM), critical activities, float, early and late dates, and schedule calculations
• Work with project and activity calendars, working hours, holidays, exceptions, and scheduling dates
• Apply constraints appropriately and identify common schedule logic problems
• Create, assign, and manage labour, equipment, material, and other project resources
• Load resources, analyze resource requirements, identify over-allocation, and understand resource leveling
• Assign costs and develop cost-loaded schedules for better project control
• Create and manage baselines and compare planned performance with the current schedule
• Update project progress using actual dates, remaining duration, physical progress, units, and costs
• Understand the Data Date and use it correctly when updating and rescheduling projects
• Monitor schedule performance, identify delays, analyze variances, and forecast project completion
• Understand Planned Value, Earned Value, Actual Cost, Schedule Performance Index, and Cost Performance Index
• Create professional layouts, filters, Gantt charts, and project reports
• Export and work with project data for reporting and analysis
• Understand delay analysis, recovery scheduling, schedule optimization, and practical project-control workflows
Whether you are a beginner learning Primavera P6 for the first time, a planning engineer developing scheduling skills, a project scheduler managing construction activities, or a project professional looking for a practical reference, this guide provides a structured path through the major functions and concepts you need to understand.
Rather than simply showing you which buttons to click, this book explains the purpose behind each major scheduling step so you can build schedules that are logical, organized, measurable, and easier to monitor.
From project setup and WBS development to activities, relationships, CPM scheduling, resources, baselines, progress updates, variance analysis, and reporting, Primavera P6 2026 User Guide provides a practical foundation for using Primavera P6 in real-world project planning and control environments.
Γεια σας! Είμαι ο Libroamiko, ο σύμβουλος βιβλίων σας.
Πώς μπορώ να σας βοηθήσω;