Δεν σας αρέσει; Δεν πειράζει! Μπορείτε να επιστρέψετε προϊόντα έως 30 ημέρες
Δεν θα κάνετε ποτέ λάθος με μια δωροεπιταγή. Χαρίστε στους αγαπημένους σας την επιλογή να διαλέξουν οι ίδιοι οτιδήποτε από τη συλλογή μας.
Έως 30 ημέρες για επιστροφή
ZERO FLOAT: A Construction Industry Thriller (The Critical Path Series, Book 1) By Mason Sterling
Every delay has a cost. Every shortcut leaves evidence.
"A structure fails long before it collapses. It fails the day someone decides the paperwork can carry a load the concrete can't."
The Hook: A Building is Built Twice Every major infrastructure project is constructed twice: once in concrete and once in a story told through paperwork. But in a world of immovable deadlines and movable truths, the story and the structure often begin to diverge. For graduate site engineer Ethan Cole, a signature is about to become more dangerous than a falling crane.
The Story: The Baseline Lie Ethan Cole is twenty-four years old and four days into his first job at the St. Catherine Medical Center-a landmark hospital project already thirteen months late and under intense political fire. While the public is promised a grand opening, Ethan discovers The Baseline Lie: a project schedule that looks perfect on a corporate dashboard but is physically impossible to build. As the project reaches Zero Float-the point where every single second of delay impacts the final deadline-the pressure to "manage documentary exposure" turns lethal. When a structural collapse leaves a man dead, Ethan is forced to choose between the "honest reporting" that could bankrupt the project and the "generous reporting" required to keep four hundred families paid. "The system does not need you innocent. It only needs you useful."
Why Readers Love This Series
Γεια σας! Είμαι ο Libroamiko, ο σύμβουλος βιβλίων σας.
Πώς μπορώ να σας βοηθήσω;